Second Avenue United Methodist Church ramp
Apr 21, 2012 | 1239 views | 0 0 comments | 3 3 recommendations | email to a friend | print
Multi-Craft Construction’s Dusty Dockery (left) and Wayne Dockery, who are father and son, work on a ramp at Second Avenue United Methodist Church, 801 E. Second Ave. (RN-T.com photo)
Multi-Craft Construction’s Dusty Dockery (left) and Wayne Dockery, who are father and son, work on a ramp at Second Avenue United Methodist Church, 801 E. Second Ave. (RN-T.com photo)
slideshow
Multi-Craft Construction’s Dusty Dockery (left) and Wayne Dockery, who are father and son, work on a ramp at Second Avenue United Methodist Church, 801 E. Second Ave. The ramp was damaged by a motorist and had to be rebuilt. Because the old ramp did not meet building-code requirements, it will be widened, and a new wall and handrail will also be installed. The church is on the corner of Second Avenue and East Eighth Street.
Comments
(0)
Comments-icon Post a Comment
No Comments Yet
Postings are not edited and are the responsibility of the author. You agree not to post comments that are abusive, threatening or obscene. Postings may be removed at our discretion.